Wednesday, 8 May 2019

...and what else?...another CHP 'gas inspection' next Wednesday....8-12, may the 15th....and let us just hope that it is neither that CID plumber (the one who used to puncture the 'bubble' mechanism in that boiler)...or the last 'inspector' who really finished that boiler off...to be followed up by lee Jackson...who was to claim that it was perfectly safe...whilst the dial was 'in the red' etc etc....anyway, mr 'church' aka 'woolley' was to come in and repair the whole lot, eventually...after having made me sign a waiver and slapped an 'at risk' notice upon it.....'happy ending' eh?...and so what I am saying is this...I don't want the whole horrorshow cycle to repeat, let us say....go figure.

No comments:

Post a Comment